Education procurement guide

How do you specify laptops for a school rollout?

A rollout is decided by two things: who holds the device, and how hard it works. Those answers set the durability, battery, serviceability and support model you need. Unit price is the last question, not the first. Below: the framework we use, a four-year cost model you can fill in, and the specification list to put in a tender.

The cheapest laptop is rarely the cheapest programme

Three schools can buy the same device and end up with three different four-year costs, because the cost is created after delivery, not at it. Damage rates, spare parts held, service logistics and staff time all move with how the device is used - and how it is used is a decision you make long before you shortlist a supplier.

That is why we start with deployment, not with a price list. If a supplier quotes you a unit price before asking who holds the device, they are pricing a product rather than a programme.

THE FRAMEWORK

The Custody-Duty Framework

Two questions decide most of the specification, and they are worth settling before you talk to anyone about unit price.

  • 1. CustodyWho holds the device between lessons? School, student, or a shared pool? Custody decides the damage exposure, the asset-tracking burden and who is holding the device when it breaks.
  • 2. DutyHow hard does it work? A cart device is charged, carried, opened and closed many times a day by many different hands. A take-home device spends far longer off-charge and travels further. Duty decides battery, hinge and chassis life.

Cross those two and you get four education profiles. Every specification argument we have with a buyer is really an argument about which profile they are in.

  • Cart-share or labCustody: school. Duty: medium-high, many users per day.Chassis and hinge life, port durability, and a screen that survives handling rather than the highest-capacity battery - cart devices spend most of their life on mains power.
  • Classroom 1:1, stays on siteCustody: school. Duty: medium.Keyboard and screen longevity, one standardised image, and enough battery for a timetabled day rather than a weekend.
  • Take-home 1:1Custody: student or family. Duty: high.Battery capacity, chassis rigidity, and management tooling that still works when the device is off your network. This is the profile where a saved unit price is most often repaid as a repair bill.
  • Loaner and swap poolCustody: school. Duty: high, short cycles.A fast reimage path and parts commonality across the fleet. If every site has a slightly different build, the swap pool cannot actually swap anything.

Decision rules: profile to specification

Use the profiles to build a test plan. Linked laptop models are references to assess, not evidence of tested hinge life, classroom runtime, impact resistance or management compatibility. Validate the exact configuration against your applications, school network and support process before selection.

Profile What actually decides it Where money is usually wasted Service model that fits Platform
Cart-share or lab Hinge and chassis life; port and screen durability; a fixed build across the cart Paying for the largest battery and the fastest processor for browser-based work Batch repair with screens and keyboards held locally NB15
Classroom 1:1 (on site) Keyboard and screen longevity; one standardised image; manageability Buying a unique configuration per year group instead of one build Warranty plus a small on-site swap pool M156FH
Take-home 1:1 Battery capacity; chassis rigidity; offline-capable asset management Trimming the chassis and the battery to protect the unit price Formal swap pool plus a written family damage policy S15
Loaner and swap pool Time to reimage; parts commonality; one image across every site Per-site configurations that make pooling impossible Parts held at the school or the district, standard build fleet-wide All education platforms

A four-year cost model you can fill in

This is the section most unit-price comparisons leave out. The model below expresses everything as index points, where the device unit price is 100. That is deliberate: it means we are not quoting you a price, and you are not comparing our assumptions with another supplier's discount.

  • Fleet of 1,000 devices, four-year life.
  • Device unit price = 100 index points. All other figures are index points per device across the four years.
  • The same device sits in every column. Only deployment differs, so any difference in the total comes from the programme, not from the hardware.
  • Every figure below is an illustrative assumption to be replaced with your own quoted numbers. It is not our pricing and not a benchmark.
Cost bucket (index points per device, 4 years) Cart-share / lab Classroom 1:1 Take-home 1:1
Acquisition: device and charger 100 100 100
Deployment: MDM enrolment, asset tagging, first setup 6 9 12
Consumables and spares held: batteries, keyboards, screens, chargers 4 7 15
Service and logistics: both directions, in and out of warranty 5 8 17
Loss and damage beyond economical repair 1 3 12
Programme administration and support desk time 2 3 6
Four-year total 118 130 162

Read the top row against the bottom row. The device is identical in all three columns. The spread - 118 against 162 in this illustration - comes from spares, service, attrition and staff time, which is exactly where custody and duty show up.

Two things follow. First, a supplier who cannot tell you which of these buckets their offer makes worse is not helping you. Second, when you replace these inputs with your own, the ranking can change - which is why the model is worth building before you shortlist rather than after you have a preferred supplier.

One thing that protects the collateral spend

Imaging, asset tagging, guidance and staff training can be reused only where the ordered build remains suitable. Each repeat order needs a current availability check and review of proposed board, firmware or component changes. Record the approval process and supply window; there is no universal 24-month build guarantee.

What to write into the tender

Tender documents tend to specify the product and leave the programme implied. These are the categories worth stating explicitly, because each one is a place a bid can look compliant and still fail in service.

Category What to specify Why it decides the outcome
Deployment profile State which of the four profiles the tender covers, and whether sites may differ. It is the input to every other requirement. Without it, bids are not comparable.
Durability and mechanical Hinge cycle expectation, port retention, screen impact resistance, and how durability is evidenced. These are the failures that remove a device from service, and they are rarely tested in a one-week evaluation.
Battery and power Required runtime under a stated load, charge-cycle expectation, and whether the battery is field-replaceable. Confirm whether battery replacement is practical, by whom, with which compatible part and at what cost. Capacity alone does not establish measured runtime.
Software and management Enrolment method, supported management tooling, image standardisation, and what happens offline. Take-home fleets fail here first.
Documentation and compliance The exact document set required for your market, as a named list, plus the battery transport documents (UN38.3 test summary and MSDS). List the documents and covered model or battery references to be reviewed before order approval and shipment. Confirm applicability for the selected destination and carrier route.
Service and lifecycle Warranty start point and duration, parts availability window, swap or repair route, and turnaround expectation. Determines buckets 3 and 4 of the cost model above.
Programme terms Standard build across sites, repeat-order availability, and how discontinuation is notified. Protects the year-one imaging and training spend.

Two gates we cannot clear

This is the part most suppliers leave until the evaluation meeting.

What this means for your tender
  • Some public-sector and institutional tenders write an ecolabel registration - typically EPEAT or TCO Certified - into the specification as a pass/fail requirement. We do not hold either registration.
  • Some tenders score past performance in education, or require named education references. We do not publish a client list, and we will not present one we cannot stand behind.
  • Neither of these is negotiable at bid stage. Both are worth checking in your own tender document before you shortlist anyone, because a gate you find at award costs you a full procurement cycle.

What to verify before you sign

Your obligations are set by your market's regulator, your tender document and your channel's contract - not by a supplier page. These are the sources worth reading directly.

  • ftc.govHow product and performance claims have to be substantiated before they are made.
  • consumer.ftc.govPlain-language guidance on advertising claims and what evidence supports them.
  • ul.comProduct safety certification and what a certification mark does and does not cover.
  • nist.govCybersecurity and identity guidance relevant to how a managed fleet is secured and administered.
  • iccwbo.orgIncoterms - who carries freight, duty and risk, and at which point it passes.
  • epeat.netThe ecolabel registration that appears as a pass/fail gate in some public procurement.
  • tcocertified.comThe environmental certification used as a gate in some institutional tenders and framework agreements.

Questions buyers ask us

  • How do we decide between a cart-share and a take-home programme?Ask the two Custody-Duty questions first. Cart-share keeps custody with the school and concentrates wear on hinges and screens; take-home moves custody to the family and concentrates cost in battery, damage and support. The specification follows from that answer, not from the budget line.
  • What is the minimum order quantity for an education order?MOQ depends on the exact model, configuration, materials and branding process. Selected available standard configurations may be quoted from one unit for evaluation. Around 100 units for a stocking batch and 1,000 units for a custom programme are planning references, subject to quotation. S18D is bulk-only with no evaluation samples.
  • Can we standardise on one build across several sites?An agreed build can be used as the fleet reference, subject to component availability and order approval. Validate the image, drivers, management tooling and accessories on the exact configuration, and record how proposed substitutions will be reviewed before future batches.
  • How long does a rollout order take?Selected available China-stock configurations typically dispatch in 2-3 business days after stock, payment and order details are confirmed. Overseas stock, coverage and transit depend on the exact model and address. Sample preparation and production are quoted separately; dispatch is not an arrival guarantee. Plan commissioning, imaging, enrolment and asset tagging after arrival.
  • Which spare parts should a programme hold?Review chargers, keyboards, displays, batteries and complete swap units against the failure path and local repair capability. Confirm exact part numbers, hardware revisions, compatibility, availability, price and any reservation. Parts do not have to come from the original production run.
  • Do you hold EPEAT or TCO Certified?No. Some public and institutional tenders make one of those registrations a pass/fail gate, and we cannot clear it. If your tender does, we are not the right supplier, and it is better to know that before you shortlist.
  • Can you provide education references?We do not publish a client list, so we will not present named education references. If your process scores past performance, check whether that is a pass/fail requirement before you invite bids.
  • What warranty applies to an education order?The standard ODM/OEM laptop policy provides a 12-month limited warranty from shipment for confirmed manufacturing defects. Confirm exclusions, RMA authorization, return freight, spare-parts availability and any chargeable repair process in the order terms. Accidental damage is not an automatic warranty inclusion.

Where to go next

Six checks to record before an education order

Write a pass criterion, exact configuration, test conditions and result for each item. These are suggested approval checks, not claims that every model has already passed them.

CheckRecord before approvalEvidence to keep
1. Actual learning workloadRequired apps, browser tabs, video calls and classroom peripherals on the exact CPU, RAM and storage buildTest scenario, software versions and observed result
2. Image and managementDrivers, image restore, enrolment, updates, sleep/wake and any offline requirementApproved image and device/build identifiers
3. Battery and chargingBrightness, workload, Wi-Fi state, required off-charge duration, adapter and charging arrangementMeasured runtime under the stated conditions; supplied power reference
4. Physical useKeyboard layout, screen readability, ports, handling and any required durability evidenceApproved keyboard/panel reference and agreed inspection evidence
5. Documents and deliveryExact model, battery, destination, carrier route, batch quantities and receiving criteriaMatched document list and agreed receiving record
6. Support and replacementsDiagnosis, RMA, compatible parts, local swap pool and responsibility for each stepNamed contacts, quoted terms and change-approval process

NB15’s standard reference is 4GB LPDDR4 + 128GB eMMC; PN141’s 128GB capacity does not establish an SSD. P1 is a non-convertible clamshell; J1 and R2 are touch convertibles. S18D is bulk-only with no evaluation samples. Choose the exact model and agreed approval evidence before planning a pilot.

Tell us the profile and the market.

Send the deployment profile, the number of devices, the destination market and the timeline. We will come back with the configuration that fits, and with the gaps we can see.

Start a project