Education procurement guide

How do you specify laptops for a school rollout?

A rollout is decided by two things: who holds the device, and how hard it works. Those answers set the durability, battery, serviceability and support model you need. Unit price is the last question, not the first. Below: the framework we use, a four-year cost model you can fill in, and the specification list to put in a tender.

The cheapest laptop is rarely the cheapest programme

Three schools can buy the same device and end up with three different four-year costs, because the cost is created after delivery, not at it. Damage rates, spare parts held, service logistics and staff time all move with how the device is used - and how it is used is a decision you make long before you shortlist a supplier.

That is why we start with deployment, not with a price list. If a supplier quotes you a unit price before asking who holds the device, they are pricing a product rather than a programme.

THE FRAMEWORK

The Custody-Duty Framework

Two questions decide most of the specification, and they are worth settling before you talk to anyone about unit price.

  • 1. CustodyWho holds the device between lessons? School, student, or a shared pool? Custody decides the damage exposure, the asset-tracking burden and who is holding the device when it breaks.
  • 2. DutyHow hard does it work? A cart device is charged, carried, opened and closed many times a day by many different hands. A take-home device spends far longer off-charge and travels further. Duty decides battery, hinge and chassis life.

Cross those two and you get four education profiles. Every specification argument we have with a buyer is really an argument about which profile they are in.

  • Cart-share or labCustody: school. Duty: medium-high, many users per day.Chassis and hinge life, port durability, and a screen that survives handling rather than the highest-capacity battery - cart devices spend most of their life on mains power.
  • Classroom 1:1, stays on siteCustody: school. Duty: medium.Keyboard and screen longevity, one standardised image, and enough battery for a timetabled day rather than a weekend.
  • Take-home 1:1Custody: student or family. Duty: high.Battery capacity, chassis rigidity, and management tooling that still works when the device is off your network. This is the profile where a saved unit price is most often repaid as a repair bill.
  • Loaner and swap poolCustody: school. Duty: high, short cycles.A fast reimage path and parts commonality across the fleet. If every site has a slightly different build, the swap pool cannot actually swap anything.

Decision rules: profile to specification

Read down the column for your profile. The middle column is where we see money spent on the wrong thing most often.

Profile What actually decides it Where money is usually wasted Service model that fits Platform
Cart-share or lab Hinge and chassis life; port and screen durability; a fixed build across the cart Paying for the largest battery and the fastest processor for browser-based work Batch repair with screens and keyboards held locally NB15
Classroom 1:1 (on site) Keyboard and screen longevity; one standardised image; manageability Buying a unique configuration per year group instead of one build Warranty plus a small on-site swap pool M156FH
Take-home 1:1 Battery capacity; chassis rigidity; offline-capable asset management Trimming the chassis and the battery to protect the unit price Formal swap pool plus a written family damage policy S15
Loaner and swap pool Time to reimage; parts commonality; one image across every site Per-site configurations that make pooling impossible Parts held at the school or the district, standard build fleet-wide All education platforms

A four-year cost model you can fill in

This is the section most unit-price comparisons leave out. The model below expresses everything as index points, where the device unit price is 100. That is deliberate: it means we are not quoting you a price, and you are not comparing our assumptions with another supplier's discount.

  • Fleet of 1,000 devices, four-year life.
  • Device unit price = 100 index points. All other figures are index points per device across the four years.
  • The same device sits in every column. Only deployment differs, so any difference in the total comes from the programme, not from the hardware.
  • Every figure below is an illustrative assumption to be replaced with your own quoted numbers. It is not our pricing and not a benchmark.
Cost bucket (index points per device, 4 years) Cart-share / lab Classroom 1:1 Take-home 1:1
Acquisition: device and charger 100 100 100
Deployment: MDM enrolment, asset tagging, first setup 6 9 12
Consumables and spares held: batteries, keyboards, screens, chargers 4 7 15
Service and logistics: both directions, in and out of warranty 5 8 17
Loss and damage beyond economical repair 1 3 12
Programme administration and support desk time 2 3 6
Four-year total 118 130 162

Read the top row against the bottom row. The device is identical in all three columns. The spread - 118 against 162 in this illustration - comes from spares, service, attrition and staff time, which is exactly where custody and duty show up.

Two things follow. First, a supplier who cannot tell you which of these buckets their offer makes worse is not helping you. Second, when you replace these inputs with your own, the ranking can change - which is why the model is worth building before you shortlist rather than after you have a preferred supplier.

One thing that protects the collateral spend

Deployment cost in year one is not only hardware. It is imaging, asset tagging, printed guidance and staff training. If the platform underneath changes, that work is repeated. Asking a supplier to hold the mainboard, the exterior and the BIOS baseline means the year-one investment still applies in year two.

What to write into the tender

Tender documents tend to specify the product and leave the programme implied. These are the categories worth stating explicitly, because each one is a place a bid can look compliant and still fail in service.

Category What to specify Why it decides the outcome
Deployment profile State which of the four profiles the tender covers, and whether sites may differ. It is the input to every other requirement. Without it, bids are not comparable.
Durability and mechanical Hinge cycle expectation, port retention, screen impact resistance, and how durability is evidenced. These are the failures that remove a device from service, and they are rarely tested in a one-week evaluation.
Battery and power Required runtime under a stated load, charge-cycle expectation, and whether the battery is field-replaceable. A non-replaceable battery effectively sets the device life. Ask before award, not in year three.
Software and management Enrolment method, supported management tooling, image standardisation, and what happens offline. Take-home fleets fail here first.
Documentation and compliance The exact document set required for your market, as a named list, plus the battery transport documents (UN38.3 test summary and MSDS). A vague clause is unenforceable at delivery. Name the documents, because a lithium battery cannot be shipped without them.
Service and lifecycle Warranty start point and duration, parts availability window, swap or repair route, and turnaround expectation. Determines buckets 3 and 4 of the cost model above.
Programme terms Standard build across sites, repeat-order availability, and how discontinuation is notified. Protects the year-one imaging and training spend.

Two gates we cannot clear

This is the part most suppliers leave until the evaluation meeting.

What this means for your tender
  • Some public-sector and institutional tenders write an ecolabel registration - typically EPEAT or TCO Certified - into the specification as a pass/fail requirement. We do not hold either registration.
  • Some tenders score past performance in education, or require named education references. We do not publish a client list, and we will not present one we cannot stand behind.
  • Neither of these is negotiable at bid stage. Both are worth checking in your own tender document before you shortlist anyone, because a gate you find at award costs you a full procurement cycle.

What to verify before you sign

Your obligations are set by your market's regulator, your tender document and your channel's contract - not by a supplier page. These are the sources worth reading directly.

  • ftc.govHow product and performance claims have to be substantiated before they are made.
  • consumer.ftc.govPlain-language guidance on advertising claims and what evidence supports them.
  • ul.comProduct safety certification and what a certification mark does and does not cover.
  • nist.govCybersecurity and identity guidance relevant to how a managed fleet is secured and administered.
  • iccwbo.orgIncoterms - who carries freight, duty and risk, and at which point it passes.
  • epeat.netThe ecolabel registration that appears as a pass/fail gate in some public procurement.
  • tcocertified.comThe environmental certification used as a gate in some institutional tenders and framework agreements.

Questions buyers ask us

  • How do we decide between a cart-share and a take-home programme?Ask the two Custody-Duty questions first. Cart-share keeps custody with the school and concentrates wear on hinges and screens; take-home moves custody to the family and concentrates cost in battery, damage and support. The specification follows from that answer, not from the budget line.
  • What is the minimum order quantity for an education order?The standard minimum is 1,000 units, with around 100 units workable depending on stock and capacity. For standard in-stock configurations the minimum is one unit, which is how most evaluations start.
  • Can we standardise on one build across several sites?Yes, and for a swap pool it is the point. One build across the fleet is what makes a spare device genuinely interchangeable instead of a second product line you have to support.
  • How long does a rollout order take?Mass production is typically 20-30 days after the specification is frozen. Sampling, if you need it, is 7-10 days. Standard in-stock configurations are dispatched from our China stock in 2-3 business days, or delivered locally in 1-2 days from our United States and European warehouses.
  • Which spare parts should a programme hold?Hold the parts that remove a device from service and are cheap to stock: screens, keyboards, chargers and batteries. Parts are sourced from the same production run, so the part number matches the revision you were shipped.
  • Do you hold EPEAT or TCO Certified?No. Some public and institutional tenders make one of those registrations a pass/fail gate, and we cannot clear it. If your tender does, we are not the right supplier, and it is better to know that before you shortlist.
  • Can you provide education references?We do not publish a client list, so we will not present named education references. If your process scores past performance, check whether that is a pass/fail requirement before you invite bids.
  • What warranty applies to an education order?12 months from the shipment date, covering the main unit and standard accessories including firmware updates.

Where to go next

Tell us the profile and the market.

Send the deployment profile, the number of devices, the destination market and the timeline. We will come back with the configuration that fits, and with the gaps we can see.

Start a project